The Compounding Tax
Mouseover text
Every one of these curves shipped a demo that worked.
Appears in Reliable Machines From Unreliable Parts
Transcript
A chart of the chance that the whole job has zero errors against the steps in the job, on a log scale from 1 to 100k. Three curves: 99% per step, 99.9% and 99.99%. Each crosses the dashed 37% line at 100, 1,000 and 10k steps.
An arrow points at the red curve’s 100-step dot: “Even if each step has a 1% error rate, a 100-step job finishes with no errors only 37% of the time.”